This 10,000 square foot building was placed into a tight existing site among mature ponderosa trees and large rock outcroppings with a backdrop of Lumpy Ridge, a famous climbing area of rock protrusions in Rocky Mountain National Park. The main ceremony area seats up to 200 guests with a warm weather ceremony platform on the overhanging deck connecting the interior to the exterior with patio doors that fold completely open.
The lower banquet space includes a dedicated bar, dance floor/stage area and a commercial kitchen. The front of the hall opens to the patio with seating and fire pits for more intimate congregation of groups. G2 performed the MEP engineering for this project.
Architect
BAS1S
Location
Estes Park, CO
Project Size
10,000 sq ft