G2 is currently providing MEP engineering services for Sundial Growers flagship facility located in Olds, Alberta Canada. This new facility will consist of 140 individually controlled cultivation rooms. When completed it will be the worlds largest cannabis cultivation facility capable of producing small batch, high quality cannabis.
G2 is design a new two (2) mega-watt combined heat and power central utility plant to serve the POD-4 expansion to the facility. Waste heat from the gas-fired turbines will be utilized to drive two absorption chillers. Waste heat will also be shunted into the hydronic heating water loop via a cascading loop for dehumidification re-heat control during the summer and ventilation/space heating during the winter.
G2 is also designing a mechanical improvement project for the existing campus. The existing mechanical systems are currently not providing sufficient cooling or dehumidification for the cultivation rooms. It is likely the CHP plant will be expanded to serve the entire
-
- LOCATION
Olds, Alberta, Canada - PROJECT SIZE
500,000 sqft - REFERENCES
Jack Keen
Vice President, Construction
jkeen@sundialgrowers.com
(250) 713-2911 - SYSTEMS
Cogeneration Central Plant
Two (2) 1 MW Gas-Fired Turbines
Two (2) 300 Ton Absorption Chillers
Two (2) 675 Ton Cooling Towers
Four (4) Standard 300 Ton Chillers
Four (4) 300 Ton Dry-Fluid Coolers
Six (6) 6,000 MBH Boilers
- LOCATION
READY TO WORK WITH G2?
G2 Consulting Engineers, Inc.
970.460.7400
1039 Main Street, Unit G
Windsor, CO 80550