Cultivation
Sundial Flagship Facility
G2 provided MEP engineering services for Sundial Growers flagship facility located in Olds, Alberta, Canada. This new facility will consist of 140 individually controlled cultivation rooms. When completed, it will be the worlds largest cannabis cultivation facility capable of producing small-batch, high-quality cannabis.
G2 is also designing a mechanical improvement project for the existing campus. The existing mechanical systems are currently not providing sufficient cooling or dehumidification for the cultivation rooms. It is likely the CHP plant will be expanded to serve the entire campus.
-
- LOCATION
Olds, Alberta, Canada
- PROJECT SIZE
500,000 SF
- REFERENCES
Jack Keen
Vice President, Construction
jkeen@sundialgrowers.com
(250) 713-2911
- SYSTEMS
Cogeneration Central Plant
Two (2) 1 MW Gas-Fired Turbines
Two (2) 300 Ton Absorption Chillers
Two (2) 675 Ton Cooling Towers
Four (4) Standard 300 Ton Chillers
Four (4) 300 Ton Dry-Fluid Coolers
Six (6) 6,000 MBH Boilers